Occupancy Readiness Tracker

Built for the path to occupancy

One platform for occupancy readiness and PDI/OCC scheduling.

Coordinate documents, commissioning, phased occupancy and site scheduling from one secure project workspace.

Private project workspaces · Canada-ready reporting
PROJECT DASHBOARDReadiness overview
Updated just nowExport report
72%

Overall readinessOn track

Open items48Across all phases
PDI progress312 / 450
Occupancy phases8 / 12
Readiness by disciplineView register →

Documentation80%

Commissioning65%

Life safety75%

Operations70%

Today's items5 upcoming
  • AHU-3 commissioning reportCommissioning · Due todayIn progress
  • PDI · Level 6 East TowerSuite inspectionsDue today
  • Phase 3 readiness reviewOccupancy · TomorrowUpcoming
Schedule overviewMay 2026   ‹  ›
MON 4TUE 5WED 6THU 7FRI 8SAT 9SUN 10OCC Phase 2PDI · L6 East TowerCommissioning walk
Phased occupancyDocument controlPDI & OCC schedulingCommissioningPDF & Excel reporting

From readiness to resident delivery

Two connected workspaces.
One reliable project picture.

Keep the compliance path and field schedule distinct, while giving the whole team a shared understanding of dates, risk and progress.
01 / READINESS

Occupancy Readiness

Control every requirement that stands between the project and occupancy.

  • Phased occupancy plans and target dates
  • Document register organized by section
  • Mechanical equipment commissioning
  • Critical actions, assignees and audit history
82% documents received24 / 29 critical ready
02 / DELIVERY

Occupancy & PDI Scheduler

Build a practical delivery programme around real suite, phase and team capacity.

  • Master occupancy and PDI schedule
  • Monthly calendar and detailed programme
  • Tarion critical dates and strategy planning
  • Saved scenarios, capacity and skip controls
450 suites planned12 occupancy phases

A clear operating system for the final stretch.

Purpose-built workflows replace disconnected status sheets without adding another layer of administrative work.

PHASES

Plan each occupancy application.

Set target dates, AO numbers, areas and phase-specific requirements. Upload highlighted drawings so the team sees exactly what each application covers.

01020304
DOCUMENTS

Know what is ready—and what is not.

Jump between life-safety sections, filter by assignee, flag critical requirements and keep every project on the same proven document structure.

Fire AlarmCompleteSprinklersCompleteElevatorsIn review
COMMISSIONING

Turn equipment lists into live tracking.

Download the template, upload Excel and follow power, startup, BAS, balancing, training and close-out without entering equipment one row at a time.

Equipment register.xlsx184 rows importedReady
COLLABORATION

Keep ownership visible.

Invite consultants, trades and internal teams. Assign Viewer, Editor or Project Admin permissions for each project and preserve a complete change history.

PSMKJL+8Project team

Decision-ready output

Report the project with clarity.

Generate professional reports for executives, consultants and trades without rebuilding the story in another spreadsheet.

  • Executive readinessProgress, constraints and phase outlook in one concise report.
  • Assignee and trade follow-upOnly the open items each responsible party needs to act on.
  • Full schedule or monthly calendarExport the entire programme or a focused month in polished PDF.
  • Structured Excel workbooksEditable, filtered data across dedicated reporting tabs.
EXECUTIVE REPORTOccupancy readiness
18 JUL 2026
RIVERSIDE CENTRE · PHASE 03

Readiness briefing

Target occupancy · 28 August 2026

Overall readiness72%Critical ready24 / 29Days to target41
Readiness by workstream

Documents82%

Commissioning68%

Life safety76%

Scheduling71%

Priority constraints

Fire alarm verification letter Critical

Elevator consultant sign-off High

Occupancy Readiness TrackerConfidential · Page 1 of 4
PDFXLSX

Start with a project.
Build from there.

Create a secure workspace in minutes, then shape the tracker around the way your project will actually reach occupancy.

Create your project
  1. 01
    Create the workspace

    Start with the standard occupancy register already organized into the right sections.

  2. 02
    Define phases and schedule

    Add areas, target dates, suite data, project capacity and occupancy logic.

  3. 03
    Bring in the team

    Invite members by email and control their role separately for every project.

  4. 04
    Track, report and adjust

    Keep the live plan current and communicate progress in one consistent format.

Private by design

Your projects stay behind login.

Visitors see the product—not your project information. Every workspace is limited to invited members, with project-level roles controlled by an administrator.

Move the project forward

Make occupancy readiness visible.

Free during early access. No credit card required.Start your first project